1.0 GENERAL 
 
 
1.1 Intent. 
 
The intent of this document is best defined as GOOD COMMERCIAL PRACTICE.  When viewed in this 
context, the requirements herein can be readily and economically satisfied by competent commercial 
Contract Manufacturers. 
 
 
1.2 Applicability. 
 
When specified in the contract, the requirements contained in this document must be adhered to by 
ADTRAN Contract Manufacturers.  In the event a Contract Manufacturer desires an exception to the 
requirements contained herein, a request delineating the exception must be submitted for ADTRAN 
approval prior to acceptance of a contract.  If a conflict exists between the provisions of this document and 
those of the contract, the contract shall take precedence. 
 
 
1.3 

Contract manufacturer Qualification. 

 
Qualified Contract Manufacturers will be determined by capability surveys, product evaluation, compliance 
of procured material with ADTRAN requirements, and the promptness and effectiveness of corrective action 
taken by the Contract Manufacturers.  Continued qualification will be contingent upon continued quality of 
performance, satisfactory results of Quality System Audits, and/or external TL9000 audit reports. 
 
 
1.4 

ADTRAN Quality System Audits. 

 
Contract Manufacturer facilities and operations may be surveyed either before or after the placement of 
contract.  The capabilities to meet ADTRAN requirements and to supply a product of consistent quality will 
be evaluated. Audits may be scheduled and conducted if required, to determine compliance with our 
purchase requirements and the requirements of this document. 
 
 
1.5 

ADTRAN Source Inspection 

 
ADTRAN reserves the right to Source Inspect product at the Contract Manufacturer’s facility after 
reasonable notice of such inspection.  Final acceptance of all material will be made at ADTRAN regardless 
of the results of Source Inspection. 
 
 
1.6 

Deviations and Substitutions. 

 
ADTRAN expects the Contract Manufacturer to comply with the requirements of the contract.  No deviations 
and/or substitutions in material, design, specifications, or operating performance are permissible unless 
documented by a contract change.  Such changes are permissible for single lots if approved by the 
ADTRAN Non-Conforming Material Report, Waiver or Deviation process.  
 
 
 
 
1.7 

Raw Material Sales (RMS) to Contract Manufacturer (CM) 

 

Summary of Contents for Q-110

Page 1: ...Q 110 QUALITY PROGRAM REQUIREMENTS FOR ADTRAN CONTRACT MANUFACTURERS Q 110 REV D Page 1 of 11...

Page 2: ...equipment Revised section 2 8 6th para to reflect approval of alternate labels C 4 21 2004 General update to Outsource Manufacturing guidelines Specifics include a Revised signature line on the Forewo...

Page 3: ...tal to any form of management or quality control This document shall serve as both a requirement and a general guide to the extent of quality control that ADTRAN anticipates from Contract Manufacturer...

Page 4: ...tingent upon continued quality of performance satisfactory results of Quality System Audits and or external TL9000 audit reports 1 4 ADTRAN Quality System Audits Contract Manufacturer facilities and o...

Page 5: ...Non Conforming RMS Material All material used on ADTRAN product shall be listed in the ADTRAN Approved Vendors List AVL and defect free RMS material determined to be wrong discrepant damaged upon init...

Page 6: ...ll notify the CM of disposition of all First Articles submissions in documented form i e email fax etc 1 8 1 Deviations to Specifications A request for deviation to a drawing or specification must be...

Page 7: ...hed operation for example a new operator new machine new technique a critical examination shall be made of the first unit s processed after the change is implemented Electro Static Discharge ESD prote...

Page 8: ...ducts delivered to ADTRAN as required by the Bill of Material It is preferred that shipping containers not exceed a maximum of 35 pounds Each container should have a consistent number of parts except...

Page 9: ...ract manufacturer shall establish and maintain a documented Quality Improvement Program to improve the quality and reliability of the processes product The program shall be active and contain a priori...

Page 10: ...shipment meet all the necessary Engineering Instructions Mechanical Specifications and Necessary Requirements and that the above parts have been inspected by this Company A copy of all working docume...

Page 11: ...OS OTHER Yes No DWG BOM POS OTHER Yes No DWG BOM POS OTHER Yes No DWG BOM POS OTHER Yes No DWG BOM POS OTHER Yes No DWG BOM POS OTHER Yes No DWG BOM POS OTHER Yes No DWG BOM POS OTHER Yes No DWG BOM P...