
5.4 Electrical
Mounting
For electrical connection please refer to the connecting diagram.
6 Maintenance
After proper mounting the instrument works maintenance free.
Heavy pollution can clog up the slit between the rotating and the stationary parts of the wind
transmitter. This slit must be kept clean.
Remark:
Please use only original packing for transporting the instrument.
7 Connecting
Diagrams
Remark:
- The cable shield should be connected on both sides (to the plug of
the wind transmitter and to the data logging) in case the data logging
or the like is on the same electrical potential.
- The cable shield should be connected on one side (only to the data
logging) in case there are potential differences between wind
transmitter and data logging.
Order-No.
4.3324.32.000
4.3324.32.001
WG / WV
WR / WD
Heating W
Heating W
Power DC
Wind Direction
Wind Velocity
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
19 pol. Euchner Steckverbindung / Plug
+3,3 ... 28V
8 - bit - Gray - Code
Windrichtung
Versorgung Heizung
Power Heating
24V AC / DC 40W
Windgeschwindigkeit
Versorgung DC
Schirm
B C
E
D
A
F G H
Hz
3 ... 1042 Hz
= 0,3 ... 50 m/s
Hz
Heizung W
20
Heizung W
20 W
B C
E
D
A
F G H
N
S
C P U
8 - 14
021591/02/09