14
Connectors and Jumpers
Primary/Secondary IDE connector (CN16/CN17)
Signal
Pin
Pin
Signal
Reset IDE
1
2
Ground
Host data 7
3
4
Host data 8
Host data 6
5
6
Host data 9
Host data 5
7
8
Host data 10
Host data 4
9
10
Host data 11
Host data 3
11
12
Host data 12
Host data 2
13
14
Host data 13
Host data 1
15
16
Host data 14
Host data 0
17
18
Host data 15
Ground
19
20
No connect
DRQ0 / DRQ1
21
22
Ground
Host IOW
23
24
Ground
Host IOR
25
26
Ground
IOCHRDY
27
28
Host ALE
DACK0 / DACK1
29
30
Ground
IRQ14 / IRQ 15
31
32
No connect
Address 1
33
34
No connect
Address 0
35
36
Address 2
Chip select 0
37
38
Chip select 1
Activity
39
40
Ground
Summary of Contents for NuPRO-860 Series
Page 4: ......
Page 8: ...iv List of Figures ...
Page 16: ...8 Introduction 1 6 EM 64 Functional Diagram Figure 1 3 EM 64 Functional Diagram ...
Page 18: ...10 Introduction ...
Page 36: ...28 Getting Started Figure 3 1 Heat Sink Installation Figure 3 2 CPU Installation ...
Page 46: ...38 Device Driver Installation ...