Introduction
7
MCM-100/102
USB port full load
38W
With voltage de-rating at high
environmental temperature
Analog Input receiving data.
Burn-in test 8.1 full running.
USB3.0 0.9A *2
full load
USB2.0 0.5A*2
full load
COM port
loopback
AI functioning
WARNING:
For heavy load situations in which power consumption may
exceed 40W, it is strongly recommended to employ a larger
power adapter. A 90W power adapter accessory is available by
contacting your ADLINK representative.
Status
Power Condition
Connected I/O
Summary of Contents for MCM-100
Page 6: ...vi Preface Leading EDGE COMPUTING This page intentionally left blank...
Page 14: ...xiv List of Tables Leading EDGE COMPUTING This page intentionally left blank...
Page 16: ...xvi List of Figures Leading EDGE COMPUTING This page intentionally left blank...
Page 34: ...18 Introduction Leading EDGE COMPUTING This page intentionally left blank...
Page 37: ...Getting Started 21 MCM 100 102 161 58 150 38 134 3 118 22 113 95 60 6...
Page 44: ...28 Getting Started Leading EDGE COMPUTING This page intentionally left blank...
Page 50: ...34 Driver Application Installation Leading EDGE COMPUTING This page intentionally left blank...
Page 64: ...48 Operation Leading EDGE COMPUTING This page intentionally left blank...
Page 87: ...BIOS Setup 71 MCM 100 102 SEMA Features Shows features supported by the SEMA version...
Page 90: ...74 BIOS Setup Leading EDGE COMPUTING Flags Shows BMC flags with exception codes...
Page 91: ...BIOS Setup 75 MCM 100 102 Power Up Lists Power Up Watchdog status...
Page 100: ...84 BIOS Setup Leading EDGE COMPUTING This page intentionally left blank...
Page 116: ...100 Important Safety Instructions Leading EDGE COMPUTING This page intentionally left blank...