98
Important Safety Instructions
Leading
EDGE COMPUTING
Never attempt to repair the device, which should only be
serviced by qualified technical personnel using suitable
tools
A Lithium-type battery may be provided for uninterrupted
backup or emergency power.
The device must be serviced by authorized technicians
when:
The power cord or plug is damaged
Liquid has entered the device interior
The device has been exposed to high humidity and/or
moisture
The device is not functioning or does not function
according to the User’s Manual
The device has been dropped and/or damaged and/or
shows obvious signs of breakage
Disconnect the power supply cord before loosening the
thumbscrews and always fasten the thumbscrews with a
screwdriver before starting the system up
It is recommended that the device be installed only in a
server room or computer room where access is:
Restricted to qualified service personnel or users familiar
with restrictions applied to the location, reasons therefor,
and any precautions required
Only afforded by the use of a tool or lock and key, or
other means of security, and controlled by the authority
responsible for the location
CAUTION:
Risk of explosion if battery is replaced with one of an incorrect
type; please dispose of used batteries appropriately.
Risque d’explosion si la pile est remplacée par une autre de
type incorrect. Veuillez jeter les piles usagées de façon appro-
priée.
Summary of Contents for MCM-100
Page 6: ...vi Preface Leading EDGE COMPUTING This page intentionally left blank...
Page 14: ...xiv List of Tables Leading EDGE COMPUTING This page intentionally left blank...
Page 16: ...xvi List of Figures Leading EDGE COMPUTING This page intentionally left blank...
Page 34: ...18 Introduction Leading EDGE COMPUTING This page intentionally left blank...
Page 37: ...Getting Started 21 MCM 100 102 161 58 150 38 134 3 118 22 113 95 60 6...
Page 44: ...28 Getting Started Leading EDGE COMPUTING This page intentionally left blank...
Page 50: ...34 Driver Application Installation Leading EDGE COMPUTING This page intentionally left blank...
Page 64: ...48 Operation Leading EDGE COMPUTING This page intentionally left blank...
Page 87: ...BIOS Setup 71 MCM 100 102 SEMA Features Shows features supported by the SEMA version...
Page 90: ...74 BIOS Setup Leading EDGE COMPUTING Flags Shows BMC flags with exception codes...
Page 91: ...BIOS Setup 75 MCM 100 102 Power Up Lists Power Up Watchdog status...
Page 100: ...84 BIOS Setup Leading EDGE COMPUTING This page intentionally left blank...
Page 116: ...100 Important Safety Instructions Leading EDGE COMPUTING This page intentionally left blank...