4-Installation Instructions
The floor must be structurally sound.
The Hearth must have a heat resistant surface to 600°C, with an insulating thickness of
non-combustible material equivalent to 24mm of cement sheet with thermal conductivity
of 0.1m2.K/W per 9mm. eg 24mm Bellis Board or equivalent.
Dimensions required in front of the heater are shown in the Elevation drawings below.
The hearth must be included beneath the heater (eg 40mm Skamotec).
Heater with Fan option.
If the heater is supplied with legs to protect the Fan during transit; lay the heater on its back, to remove
the legs. The heater can then be carefully put into position. The Heater will need to be inserted into the
chimney build out before the construction is completed.
The Installations can be included into a Masonry installation, built as a default non-combustible chimney
opening meeting the requirements for the National Construction Code or the Building Code of Australia.
The tested installation is built into Skamotec 225. This can be done in 2 ways:
1.
Chimney Build Out version (no combustibles within 50mm of each side wall, or
2.
Cabinetry version; if Combustible materials will be built alongside the installation. This version
includes as extra side cavity with 50mm clearance each side. See below.
Note:
An Optional Kit form is available for the Chimney Build Out version.
Summary of Contents for 1000NMV-B
Page 11: ...11 The parts list required for the build out is shown...
Page 13: ...13 STEP 3 STEP 4...
Page 14: ...14 STEP 5 STEP 6...
Page 16: ...16 The parts required for the build out is shown below...
Page 19: ...19 STEP 5 STEP 6...
Page 36: ...36...