10
/
19
DWASH100 :
A
–
Fresh water inlet
B
–
Power cord
C
–
Dirty water outlet
D
–
Connection of the machine to grounding line that has independently and adequately technical feature.
E
–
Tap with connector to supply the pressured (202
–
404 kpa) and hot water (45-50 ºC).(If the water hardness is higher
than 10
–
15ºF, softening water device must be used.)
F
–
Dirty water drainage in 50 mm of diameter, which dirty water hose will be connected to. (on the ground and below the
machine, and next to the back wall.)
G- 380 V 3x25 A. K
–
automat fuse group to meet the requirement of the device.
PREPARATION FOR START UP
Open the packing of the device and remove all protective tapes.
Opening the cover of the device, take out the instruction manual.
Place the devices with adjustable legs by adjusting their legs and the device with fixed legs by aligning the ground.
Connect the elbowed part of the supply hose the solenoid valve of the device,the other end,to the tap.
Clamp one end of drainage hose to the drainage outlet of the machine.Connect the other end of it to sewer system
coming from the ground.
Drainage hose must not be twisted, folded, and bent more than 90º
Supply water must be at 50ºC in temperature and 202 to 404 kpa in pressure
If the connection to sewer system on the ground is above the drainage outlet of the machine, a drainage pump must
be used.
If water pressure is higher than 404 kpa, a pressure reducer valve must be used.
If the water pressure is lower than 202 kpa, a water pressurizing pump must be used.
Supply water of the machine must be a 10 to 15 º Fr.
If it is not so, a water softening device must be used.
Drainage line to sewer system on the ground, which drainage pipe was connected to, must have a siphon, in order to
prevent bad smells.
Required voltage a washing machine is 380-400 AC V / 50 Hz.
Make a grounding connection and be sure that this connection has been made correctly.
Be sure that there is energy supply in the system.
On the condition that you have fulfilled all requirement for operating the device, your device is ready for working.
FINAL CHECK BEFORE START UP
o
The users should fulfill the following last-controls by accepting the required couplings of fresh water, electric,
wastewater , installations to be carried out by the authorized technicians;
o
You must be sure that the power supply and grounding installation are ensured as required in leaflets of electrical
equipment.
o
You must be sure that the feeding water has been installed and the water vane is turned on.
o
You must be sure that the wastewater installation was done properly and discharging hose was coupled with
discharging pipe tightly.