Adcraft CBS-2 User Manual Download Page 9

Coffee Brewer - CBS-2

Reference 

Number

Part Number

Description

1

CBS-1

 Foot

2

Bottom Cover

3

Base Frame

4

Power Cord Ring

5

CBS-5 

Plug , Power Cord, Strain Releif, Power Cord Clip

6

CBCP-6

Indicator Light, Red

10

CBS-10

Power Switch

11

Outside Switch Holder

12

Inside Switch Holder

13

Body Frame

14

Outflow Pipe

15

Draining Pipe Copper Tube

17

Rear Cover

18

CBS-18

Thermomstat

19

Hold-Down Strap

20

CBS-20

Main Heater

21

CBS-21

Adjustable Thermostat

22

Fever Partition

23

Mica Heater Fixer

25A

CBS-25

Mica Heater

26A

Warming Plate

28

Shaft for Metal Lid of Water Resivior

29A

Lid of Water Reservoir

30A

Mesh of Water Entrance

32A

Upper Cover

33

Steam Hose

34

Inflow Pipe

35

Outflow Pipe

36

Lid of Tank

38

Block-Thermostat Tube

39

CBS-39

Tank Gasket

41

Water Basin

42

Boiler Tank

44

CBS-44

Relay

45

Upper Frame

46

Indicate Panel

47

CBS-47

Switch for Warming Plate

49

Outflow Pipe

50

Elbow-Out

51A

Sprinker Holder

53

CBS-53

S/S Filter Pan and "W" Spring

55

CBS-55

Spinkler Gasket

56

Sprinkler

57

Screw of Sprinkler

VER811

Summary of Contents for CBS-2

Page 1: ...ant information regarding your Admiral Craft unit Please read this manual thoroughly prior to equipment set up operation and maintenance Failure to comply with regular maintenance guidelines outlined...

Page 2: ...rnings Never immerse the machine in water If the machine has been immersed it must be dried and checked by an authorized technician before being used again Never pour hot water into the water entrance...

Page 3: ...3 Slide the Filter Basket into the rails 4 Place a decanter at the base of machine under the Basket 5 Pour 5 liters of cool water into the machine through the Water Entrance 4 Allow approximately two...

Page 4: ...et into the server very quickly When brewing is completed the coffee can be served immediately Discard the grounds and filter The Ready to Brew indication will turn off and the Boiler will start heati...

Page 5: ...is first The De sediment process must be conducted by trained professional personnel and it is suggested that a service technician be contacted to perform the service The De sediment process is comple...

Page 6: ...st this setting Open the top cover of machine so that the temperature controller can be seen Turn it very slowly An accessory knob with temperature ratings is available for service personnel to assist...

Page 7: ...C B S 2 V E R 8 1 1...

Page 8: ...C B S 2 V E R 8 1 1...

Page 9: ...eater 21 CBS 21 Adjustable Thermostat 22 Fever Partition 23 Mica Heater Fixer 25A CBS 25 Mica Heater 26A Warming Plate 28 Shaft for Metal Lid of Water Resivior 29A Lid of Water Reservoir 30A Mesh of W...

Page 10: ...oper utility connection or supply and problems due to improper ventilation Equipment that has not properly been maintained damage from improper cleaning and water damage to controls Equipment that has...

Reviews: