Adcraft CBS-2 User Manual Download Page 2

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

Please refer to the following parts and diagram when reading the 
remainder of this manual.

 

 

Body of Machine

 

Power Switch

 

Filter Basket

 

Water Entrance

 

Coffee Pot ( **Not Included**)

 

Heating Plate

 

Heating Plate Power Switch

 

"Ready" Indicator

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

Warnings:

 

 

 

Never 

immerse  the  machine  in  water.  If  the  machine  has  been 

immersed, it  must  be  dried  and  checked  by  an  authorized 

technician  before  being used again. 

Never 

pour hot water into the water entrance. 

When  the  machine  is  in  use,  some  parts  of  the  machine  are 

very  hot,  please  ensure  the  power  cord  does  not  touch  hot 

parts. The user should also be careful not to touch the hot parts. 

Remain in the vicinity of the machine while machine is in      

        operation

Summary of Contents for CBS-2

Page 1: ...ant information regarding your Admiral Craft unit Please read this manual thoroughly prior to equipment set up operation and maintenance Failure to comply with regular maintenance guidelines outlined...

Page 2: ...rnings Never immerse the machine in water If the machine has been immersed it must be dried and checked by an authorized technician before being used again Never pour hot water into the water entrance...

Page 3: ...3 Slide the Filter Basket into the rails 4 Place a decanter at the base of machine under the Basket 5 Pour 5 liters of cool water into the machine through the Water Entrance 4 Allow approximately two...

Page 4: ...et into the server very quickly When brewing is completed the coffee can be served immediately Discard the grounds and filter The Ready to Brew indication will turn off and the Boiler will start heati...

Page 5: ...is first The De sediment process must be conducted by trained professional personnel and it is suggested that a service technician be contacted to perform the service The De sediment process is comple...

Page 6: ...st this setting Open the top cover of machine so that the temperature controller can be seen Turn it very slowly An accessory knob with temperature ratings is available for service personnel to assist...

Page 7: ...C B S 2 V E R 8 1 1...

Page 8: ...C B S 2 V E R 8 1 1...

Page 9: ...eater 21 CBS 21 Adjustable Thermostat 22 Fever Partition 23 Mica Heater Fixer 25A CBS 25 Mica Heater 26A Warming Plate 28 Shaft for Metal Lid of Water Resivior 29A Lid of Water Reservoir 30A Mesh of W...

Page 10: ...oper utility connection or supply and problems due to improper ventilation Equipment that has not properly been maintained damage from improper cleaning and water damage to controls Equipment that has...

Reviews: