© Adam Equipment Company 2020
8
5.0 REPLACING THE LOAD CELL
Check that the power is switched off, then follow these steps to replace the load cell:
Open the scale casing and ensure the power is switched off.
Unscrew the 4 holding screws on the metal frame.
Then unscrew the 2 central screws holding the load cell in place.
Lift the metal frame to expose the load cell.
Detach load cell from the scale.
Once removed, replace this with the new load cell.
Place the metal frame onto the new load cell carefully ensuring that the screw
positions line up.
Screw in the 2 central screw points to hold the load cell in place, then carefully
screw in the 4 exterior screw points.
Once secure, place the scale’s exterior casing back onto the scale base and screw
to close.
6.0 REPLACING THE DISPLAY
To replace the display, ensure that you have switched off the power, then follow these steps:
Remove the scale’s exterior casing
Disconnect all exterior wires and power cables leading to the PCB display.
Lift the display from the pegs located in the corners of the display
Once detached, attach the new display to the pegs then connect the previously
detached wires to the new display unit. Screw in to secure.
Load
cell
Central screws
4 holding
screws
Pegs
Summary of Contents for CKT 16
Page 22: ...Adam Equipment Company 2020 19...