
Page
45
Doc : AM210-001E Release: 1.4 updated : 2015
MESSAGES DURING TEST OPERATION
DOOR OPEN
CAUTION!
Test compartment door should be closed during all duration of test.
If the door is inadvertently opened during the test, the system will display a message and suspend the
scan progress to preserve the quality of the measurement till the door is closed.
TUBE NOT DETECTED
When the test is initiated, the system checks the presence of the test tube.
If the optical systems cannot detect the tube, the following message will be displayed:
-
Check if there is a tube in test compartment
If the problem persists, verify that the tube has correct dimensions and if yes, contact AD systems service
department.
TEST INTERRUPTION
When it is necessary to abort a test in progress, press the STOP button. A dedicated message will ask for
confirmation of the test interruption.