ACV International
32
6
COMMISIONING THE APPLIANCE
6.1
Filling and venting the appliance and the installation
6.1.1
CH system
WARNING
If an additive is added to the CH water, this must be
suitable for the materials used in the appliance, such as
copper, brass, stainless steel, steel, plastic and rubber.
1.
Insert the appliance plug into a wall socket.
The appliance may perform a self test:
2
(on service display).
The appliance will then go into wait mode:
-
(on service display).
2.
Connect the filling hose to the filling/drain tap and fill the installation with clean
drinking water, to a maximum pressure of 1-2 bar in the case of a cold
installation. (Indicated on the temperature display.)
3.
Bleed the appliance with the manual bleed screw (A).
An automatic air bleeding device may be fitted to the appliance in place of the
manual bleed screw.
4.
Bleed the air in the installation with the manual bleed screws on the radiators.
5.
Top up the CH installation if the pressure has dropped too far as a result of the
air bleeding.
6.
Check all couplings for leakage.
7.
Fill the siphon with water.
6.1.2
Hot water supply (only with external DHW tank)
1.
Open the main tap in order to pressurise the hot water part.
2.
De-aerate the heat exchanger and the pipe system by opening a hot water tap.
Leave the tap open until all the air has left the system.
3.
Check all joints for leaks.
6.1.3
Gas supply
1.
Vent the gas supply with the pre-pressure measurement nipple (D) on the gas
block.
2.
Check the connections for leaks.
3.
Check the pre-pressure and the burner pressure
Summary of Contents for Kompakt HRE eco 12 Solo
Page 55: ...ACV International 55...