background image

EN • 5

661Y0400.F

ENGLISH

FRANCAIS

NEDERLANDS

ESP

AÑOL

IT

ALIANO

РУ

ССКИЙ

DEUTSCH

TECHNICAL CHARACTERISTICS 

Tank characteristics

ECO

100

ECO

130

ECO

160

HL

100

HL

130

HL

160

HL

210

HL

240

HLE

100

HLE

130

HLE

160

HLE

210

HLE

240

Total capacity

L

105

130

161

105

130

161

203

242

105

130

161

203

242

Primary capacity

L

30

31

35

30

31

35

39

42

30

31

35

39

42

Primary fl uid fl ow rate

L/h

2100

2600

3500

2100

2600

3500

4200

5500

2100

2600

3500

4200

5500

Primary pressure drop

mbar

17

22

37

17

22

37

45

51

17

22

37

45

51

Heating surface

m

2

1,03

1,26

1,54

1,03

1,26

1,54

1,94

2,29

1,03

1,26

1,54

1,94

2,29

Tank performances

ECO

100

ECO

130

ECO

160

HL

100

HL

130

HL

160

HL

210

HL

240

HLE

100

HLE

130

HLE

160

HLE

210

HLE

240

Peak fl ow at 40°C

L/10’

236

321

406

236

321

406

547

700

236

321

406

547

700

Peak fl ow at 60°C

L/10’

117

161

209

117

161

209

272

337

117

161

209

272

337

Peak fl ow at 40°C

L/60’

784

1063

1349

784

1063

1349

1820

2319

784

1063

1349

1820

2319

Peak fl ow at 60°C

L/60’

384

549

689

384

549

689

913

1165

384

549

689

913

1165

Constant fl ow at 40°C

L/h

658

890

1132

658

890

1132

1527

1943

658

890

1132

1527

1943

Constant fl ow at 60°C

L/h

320

465

576

320

465

576

769

994

320

465

576

769

994

Pre-heating time

minutes

24

22

22

24

22

22

20

20

24

22

22

20

20

Coeffi cient

NL

1,0

2,1

3,0

1,0

2,1

3,0

5,2

11,8

1,0

2,1

3,0

5,2

11,8

Power  drawn

kW

23

31

39

23

31

39

53

68

23

31

39

53

68

Heating time with the 2,2 kW 
heating element, from 10 to 
60°C

2 h 43’

3 h 27’

4 h 20’

5 h 37’

6 h 37’

Running conditions: 85°C   

Water intake T°: 10°C

OPERATING  CONDITION

Maximum service pressure 

[tank filled with water] 

- Heating circuit: 

3 bar

- DHW circuit: 

10 bar

Test pressure 

[tank filled with water]

- Heating circuit: 

4,5 bar

- DHW circuit: 

13 bar

WIRING DIAGRAM

Operating temperature

- Maximum temperature: 90°C

Water quality

• Chlorides: 

< 150 mg/L [304 Stainless steel]

 

 

< 2000 mg/L [Duplex]

• 6 

 

ph

 

 8

c

1

2

NL

1

L1

N

2

1

7

2

1

2

3

4

5

6

1

2

3

4

5

6

c

1

2

c

1

2

3

4

6

5

HL

HLE

Br

Y/Gr

B

Br

Br

Y/Gr

B

B

Br

Y/Gr

B

Br

B

Br

Br

W

W

Y/Gr

B

B

B

B

G

B

R

G

Bk

Or

R

R

B

Br

R

V

Br

Or

7

 B. 

Blue

 Bk. Black
 Br. 

Brown

 G. 

Grey

 Or. 

Orange

 R. 

Red

 V. 

Violet

 W. 

White

 Y/Gr.  Yellow/Green

1.  230 Volt connection cord
2.  Control thermostat [60/90°C]
3.  Manual reset high limit thermostat [103°C max.]
4. Summer/Winter 

switch

5.  Domestic hot water priority relay
6.  Electric heating element
7.  Load pump [in option]

Summary of Contents for ECO

Page 1: ...EN 1 661Y0400 F ENGLISH FRANCAIS NEDERLANDS ESPA OL ITALIANO DEUTSCH Installation Operating and Servicing Instructions ECO 100 130 160 HL 100 130 160 210 240 HLE 100 130 160 210 240 ECO HL HLE...

Page 2: ...CHARACTERISTICS 5 Operating condition 5 Wiring diagram 5 INSTALLATION INSTRUCTIONS 6 Installation 6 INSTALLATION 7 Dimensions 7 Central heating connections 7 Domestic hot water connection 8 COMMISSIO...

Page 3: ...Units are shipped ready to install tested and packaged in a car board box Contents of the package One hot water tank One multilingual technical instruction manual One wall mounting kit with support an...

Page 4: ...rom the primary circuit arriving from the boiler is made of carbon steel STW 22 Thermal Insulation Soft polyurethane foam 30 mm thickness Lining Exterior of casing vinyl coated and polypropylene cap E...

Page 5: ...132 658 890 1132 1527 1943 658 890 1132 1527 1943 Constant flow at 60 C L h 320 465 576 320 465 576 769 994 320 465 576 769 994 Pre heating time minutes 24 22 22 24 22 22 20 20 24 22 22 20 20 Coeffici...

Page 6: ...connection ECO HLE HL Horizontal wall hung position with the domestic water connection on the right side 1 Mount the tank on the wall using the supplied brackets 2 Move if necessary the long PVCC dip...

Page 7: ...1 4 ECO HL HLE 160 L 1 1 4 HL HLE 210 L 1 1 4 HL HLE 240 L 1 1 4 1 System filling valve 2 Safety valve calibrated to 3 bar 3 Expansion vessel 4 Drain cock 5 Isolation valve heating system 6 Room therm...

Page 8: ...omprising at least the following An isolating valve 1 a non return valve 3 a safety valve 4 set to 10 bar a sanitary expansion vessel of appropriate dimensions When the operating pressure exceeds 6 ba...

Page 9: ...t water tank and primary circuit filled with water Air bleed correctly carried out on both circuits Air valve sealed Both hot and cold water pipes correctly connected to the tank s hot water circuit H...

Page 10: ...gineer ANNUAL SERVICE The annual service carried out by a technician must include the following Checking the air valve The air bleed can lead to water being added to the system Check the pressure on t...

Page 11: ...97B0003 497B0005 497B0007 497B0009 497B0010 B04 51410183 51410184 51410185 51410186 51410187 B05 39438027 39438027 39438027 39438027 39438027 N HLE HVS 100 HLE HVS 130 HLE HVS 160 HLE HVS 210 HLE HVS...

Page 12: ...5006 55445006 55445006 55445006 49410036 49410036 49410036 49410036 54442045 54442045 54442045 54764009 54428107 54428107 54762004 55412023 55412023 24614157 24614158 51410180 51410180 51410180 514101...

Reviews: