background image

EN • 1

661Y0400.F

ENGLISH

FRANCAIS

NEDERLANDS

ESP

AÑOL

IT

ALIANO

РУ

ССКИЙ

DEUTSCH

Installation, Operating and

Servicing Instructions

ECO 

100 / 130 / 160

HL 

100 / 130 / 160 / 210 / 240

HLE 

100 / 130 / 160 / 210 / 240

ECO - HL - HLE

Summary of Contents for ECO

Page 1: ...EN 1 661Y0400 F ENGLISH FRANCAIS NEDERLANDS ESPA OL ITALIANO DEUTSCH Installation Operating and Servicing Instructions ECO 100 130 160 HL 100 130 160 210 240 HLE 100 130 160 210 240 ECO HL HLE...

Page 2: ...CHARACTERISTICS 5 Operating condition 5 Wiring diagram 5 INSTALLATION INSTRUCTIONS 6 Installation 6 INSTALLATION 7 Dimensions 7 Central heating connections 7 Domestic hot water connection 8 COMMISSIO...

Page 3: ...Units are shipped ready to install tested and packaged in a car board box Contents of the package One hot water tank One multilingual technical instruction manual One wall mounting kit with support an...

Page 4: ...rom the primary circuit arriving from the boiler is made of carbon steel STW 22 Thermal Insulation Soft polyurethane foam 30 mm thickness Lining Exterior of casing vinyl coated and polypropylene cap E...

Page 5: ...132 658 890 1132 1527 1943 658 890 1132 1527 1943 Constant flow at 60 C L h 320 465 576 320 465 576 769 994 320 465 576 769 994 Pre heating time minutes 24 22 22 24 22 22 20 20 24 22 22 20 20 Coeffici...

Page 6: ...connection ECO HLE HL Horizontal wall hung position with the domestic water connection on the right side 1 Mount the tank on the wall using the supplied brackets 2 Move if necessary the long PVCC dip...

Page 7: ...1 4 ECO HL HLE 160 L 1 1 4 HL HLE 210 L 1 1 4 HL HLE 240 L 1 1 4 1 System filling valve 2 Safety valve calibrated to 3 bar 3 Expansion vessel 4 Drain cock 5 Isolation valve heating system 6 Room therm...

Page 8: ...omprising at least the following An isolating valve 1 a non return valve 3 a safety valve 4 set to 10 bar a sanitary expansion vessel of appropriate dimensions When the operating pressure exceeds 6 ba...

Page 9: ...t water tank and primary circuit filled with water Air bleed correctly carried out on both circuits Air valve sealed Both hot and cold water pipes correctly connected to the tank s hot water circuit H...

Page 10: ...gineer ANNUAL SERVICE The annual service carried out by a technician must include the following Checking the air valve The air bleed can lead to water being added to the system Check the pressure on t...

Page 11: ...97B0003 497B0005 497B0007 497B0009 497B0010 B04 51410183 51410184 51410185 51410186 51410187 B05 39438027 39438027 39438027 39438027 39438027 N HLE HVS 100 HLE HVS 130 HLE HVS 160 HLE HVS 210 HLE HVS...

Page 12: ...5006 55445006 55445006 55445006 49410036 49410036 49410036 49410036 54442045 54442045 54442045 54764009 54428107 54428107 54762004 55412023 55412023 24614157 24614158 51410180 51410180 51410180 514101...

Reviews: