background image

EN • 3

661Y0400.F

ENGLISH

FRANCAIS

NEDERLANDS

ESP

AÑOL

IT

ALIANO

РУ

ССКИЙ

DEUTSCH

WHO SHOULD READ THESE INSTRUCTIONS

These instructions should be read by:
- the specifying engineer
- the installer
- the user
- the service engineer

SYMBOLS

The following symbols are used in this manual:

 

• It is important to switch the tank OFF before carrying out 

any work.

•  There are no user accessible parts inside the tank casing.

APPLICABLE STANDARDS

The appliances carry the 

CE

 mark in accordance with the

standards in force in the various countries.

WARNINGS

This documentation is part of the information delivered with the 
appliance and must be given to the user and stored in a safe 
place!

An approved installer must carry out the assembly, commissioning, 
maintenance and repair of the system, in accordance with current 
standards in force.

ACV shall not accept any responsibility for damage caused by non-
compliant location of the system or by use of the parts or
connections not approved by ACV for this application.

  The manufacturer reserves the right to change the 

technical characteristics and specification of its
products without notice.

  The availability of some versions and their accessories is 

market dependant.  

PACKING

Units are shipped ready to install, tested and packaged in a car-
board box.

Contents of the package

• One hot water tank.
• One multilingual technical instruction manual.
• One wall-mounting kit with support and one flow diverter.

WARNINGS

RECOMMENDATIONS

 

• Please, read carefully this manual before installing and

commissioning the tank.

•  It is prohibited to carry out any modifications to the inside of 

the appliance without the manufacturer’s prior and written 
agreement.

• The product must be installed and serviced by trained

engineers, in compliance with current standards.

• The installation must comply with the instructions in this 

manual and with the codes and standards governing systems 
for the production of hot water.

• Any failure to follow instructions relating to tests and test 

procedures may result in personal injury or risks of pollution.

• To guarantee safe and correct operation of the appliance, it 

is important to have it serviced and maintained every year by 
an approved installer or maintenance company.

• In case of anomaly, please call  your service engineer.

•  The parts may only be replaced by genuine factory parts. You 

will find a list of the spare parts and their reference number 
ACV to the end of this document.

 

Danger of burns

Essential instruction for
the safety of persons
and the environment.

Danger of electrocution.

Essential instruction for
the correct operation of
the installation.

Summary of Contents for ECO

Page 1: ...EN 1 661Y0400 F ENGLISH FRANCAIS NEDERLANDS ESPA OL ITALIANO DEUTSCH Installation Operating and Servicing Instructions ECO 100 130 160 HL 100 130 160 210 240 HLE 100 130 160 210 240 ECO HL HLE...

Page 2: ...CHARACTERISTICS 5 Operating condition 5 Wiring diagram 5 INSTALLATION INSTRUCTIONS 6 Installation 6 INSTALLATION 7 Dimensions 7 Central heating connections 7 Domestic hot water connection 8 COMMISSIO...

Page 3: ...Units are shipped ready to install tested and packaged in a car board box Contents of the package One hot water tank One multilingual technical instruction manual One wall mounting kit with support an...

Page 4: ...rom the primary circuit arriving from the boiler is made of carbon steel STW 22 Thermal Insulation Soft polyurethane foam 30 mm thickness Lining Exterior of casing vinyl coated and polypropylene cap E...

Page 5: ...132 658 890 1132 1527 1943 658 890 1132 1527 1943 Constant flow at 60 C L h 320 465 576 320 465 576 769 994 320 465 576 769 994 Pre heating time minutes 24 22 22 24 22 22 20 20 24 22 22 20 20 Coeffici...

Page 6: ...connection ECO HLE HL Horizontal wall hung position with the domestic water connection on the right side 1 Mount the tank on the wall using the supplied brackets 2 Move if necessary the long PVCC dip...

Page 7: ...1 4 ECO HL HLE 160 L 1 1 4 HL HLE 210 L 1 1 4 HL HLE 240 L 1 1 4 1 System filling valve 2 Safety valve calibrated to 3 bar 3 Expansion vessel 4 Drain cock 5 Isolation valve heating system 6 Room therm...

Page 8: ...omprising at least the following An isolating valve 1 a non return valve 3 a safety valve 4 set to 10 bar a sanitary expansion vessel of appropriate dimensions When the operating pressure exceeds 6 ba...

Page 9: ...t water tank and primary circuit filled with water Air bleed correctly carried out on both circuits Air valve sealed Both hot and cold water pipes correctly connected to the tank s hot water circuit H...

Page 10: ...gineer ANNUAL SERVICE The annual service carried out by a technician must include the following Checking the air valve The air bleed can lead to water being added to the system Check the pressure on t...

Page 11: ...97B0003 497B0005 497B0007 497B0009 497B0010 B04 51410183 51410184 51410185 51410186 51410187 B05 39438027 39438027 39438027 39438027 39438027 N HLE HVS 100 HLE HVS 130 HLE HVS 160 HLE HVS 210 HLE HVS...

Page 12: ...5006 55445006 55445006 55445006 49410036 49410036 49410036 49410036 54442045 54442045 54442045 54764009 54428107 54428107 54762004 55412023 55412023 24614157 24614158 51410180 51410180 51410180 514101...

Reviews: