A1007841-664Y7800 • A
RECOMMENDATIONS FOR THE HYDRAULIC INSTALLATION
• Thoroughly rinse the system before connecting the boiler
• Water treatment is recommended to prevent corrosion and the formation of scale in the boiler and piping.
• If the boiler is to be installed in an existing system, ACV recommends using a cleaning agent in the
systems.
• After connecting the hydraulic circuit, check the absence of leaks.
HEATING CONNECTION
Make sure to install isolating valves on the system heating circuit, so as to be able to drain the boiler,
without draining the whole system.
Typical system - low temperature
KEY
1. Isolation valve
2. 3-way mixing valve
3. Circulating pump (built-in)
4. Filling valve
5. Check valve
6. Expansion vessel (built-in, for a 160L circuit)
7. Safety valve (built-in)
8. Draining valve
9. Automatic air vent (built-in)
Typical system - high temperature
KEY
1. Isolation valve
2. Circulating pump (built-in)
3. Filling valve
4. Check valve
5. Expansion vessel (built-in, for a 160L circuit)
6. Safety valve (built-in)
7. Draining valve
8. Automatic air vent (built-in)
EN
Installation
Cold water
Hot water
1
1
7
2
4
5
6
8
3
1
1
2
3
4
5
6
7
8
9
In the case of a floor heating system, make
sure that the pomp is set to the "Constant
pressure" mode.
Summary of Contents for E-Tech W 09 Mono
Page 28: ...ACV International Oude Vijverweg 6 B 1653 Dworp Belgium belgium service acv com www acv com...
Page 29: ...E Tech W 09 15 Mono 09 15 22 28 36 Tri A1007841_664Y7800 A ML...
Page 31: ...3 763 mm 442 mm 332 mm 185 mm 370 mm 105 mm Min 25 mm Min 400 mm Min 200 mm ML...
Page 56: ...28 2 3 4 5 1 6 7 8 9 10 12 13 11 14 16 17 18 15 12 ML...
Page 60: ...32 ML...
Page 61: ...33 ML...
Page 63: ...35 ML...
Page 64: ...ACV International Oude Vijverweg 6 B 1653 Dworp Belgium belgium service acv com www acv com...