![Acucraft circular 4 Operator'S Manual Download Page 15](http://html1.mh-extra.com/html/acucraft/circular-4/circular-4_operators-manual_2844413015.webp)
15
Installing the Dual Pane Glass
Step 1: Install inner pane of glass in the channel
INSTALLATION GUIDE
Always wear protective equipment when
dealing with hot surfaces. Failure to follow
this warning may result in serious injury.
WARNING
Step 2: Install the inner frame with the countersunk screws
provided
Step 3: Install the outer glass in the channel
Step 4: Install the outer removable frame with the
countersunk screws provided
DRAFT
Summary of Contents for circular 4
Page 8: ...8 INSTALLATION GUIDE D R A F T...
Page 24: ...SUPPLEMENTAL MATERIAL 24 Gas Valve Ignition Module D R A F T...
Page 25: ...SUPPLEMENTAL MATERIAL 25 Gas Valve Ignition Module D R A F T...
Page 35: ...NOTES D R A F T...
Page 37: ...37 PRODUCT SPECIFICATIONS D R A F T...
Page 38: ...38 PRODUCT SPECIFICATIONS D R A F T...
Page 44: ...44 NOTES D R A F T...