Installation and Commissioning Guide
Variable Capacity Commercial
9
Installation and Commissioning Guide - Split Ducted Variable Capacity Commercial Indoor Unit
Doc. No. 0525 - 068
Ver. 3 201104
EQUIPMENT REQUIRED FOR CRANE LIFTING:
●
1 x shackle
●
2 x nylon slings
●
4 x rubber pads
Procedure:
1. Slip nylon slings through the pallet as shown in Fig. 1.
2. Use a Bow or Dee shackle to connect the slings.
3. Ensure slings are protected by rubber pads or similar if slings are draped across unit edges, corners, or air grilles .
This will prevent the unit from being damaged during lifting.
4. Test lift the unit to determine exact unit balance and stability before hoisting it to the installation location.
06.02. Fork Lift Method
FIG. 2
Insert forklift
tines here
DO NOT LIFT UNIT from this end in order to
prevent damage to electrical panel and pipes.
CAUTION
ELECTRICAL
PANEL END
Procedure:
1. To move the unit around with a forklift, insert the fork tines through the pallet, as shown in Fig. 2.
2. Do not lift the unit through the electrical panel end of the unit (See illustration for location of electrical panel end).
CAUTION
Length of fork lift tines must pass the unit middle section, in order to safely carry the unit.
Pallet fork lifting hole dimensions
All dimensions in mm.
860
100
100
35
35
100
850
850