INSTALLATION GUIDE
DWFX-F Installation Method
Health and safety
• This process must be undertaken by competent per-
sons. More than one person may be required to ensure
the safe handling of large dampers and other materi-
als. Use must be made of access equipment to ensure
unsafe practices are not used to approach walls or diffi
-
cult access areas.
• Standard site PPE should be used (minimum steel toe
cap boots, hard hat); together with any protective
eyewear, gloves and masks, when drilling or cutting is
being undertaken. The latter should also be used when
handing the wall construction materials, as defined by
the material suppliers. If loud equipment is being used,
hearing protection should be used.
• All waste materials should be collected and disposed of
as defined by the relevant supplier.
• Actuators: All wiring should be carried out in accor-
dance with the wiring details provided by the IEE and
BS regulations and by a competent person. Care must
be taken when installing and inspecting dampers, as
they are likely to close without warning due to loss of
electrical power or a temperature rise in the ductwork.
This is their prime function. Do not insert any items,
fingers or limbs between the blades. Larger dampers
must be handled in accordance with current regula-
tions and good practice due to weight.
Drawings
Please visit our website to download the installation dra-
wings, which are located on the relevant product down-
load section.
Applies to...
• Actionair SmokeShield PTC
• Actionair FireShield
Contents
Drawings ............................................. 1
Applies to ............................................. 1
Health and safety .................................. 1
CE Installation Method Overview ...............2
Vertical Damper Installation in Plasterboard
Walls ...................................................3
Vertical Damper, Alblative Batt in a
Plasterboard Wall ...................................4
Vertical Damper Installation (Top Flange
removed) in a Plasterboard Wall under
Concrete Slab ........................................5
Vertical Damper Installation in Masonry Walls
6
Vertical Damper, Ablative Batt in Masonry
Walls ................................................... 7
Vertical Damper (with a Pattress) in a
Masonry Wall ........................................8
Vertical Damper in a Masonry Wall against
slab ....................................................9
Periodic maintenance .............................10
Actuators ............................................ 11
Control Mode Installation Procedure .............................11
Wiring Diagrams .......................................................... 12
DWFX-F Damper Dimensional Data ............13
Actionair SmokeShield PTC .......................................... 13
Actionair FireShield ...................................................... 15
Inspection and handover check sheet .........16