July 2020 |
Page
36
NSW/WA/SA/ACT
02 8708 4400
VIC/TAS
03 8773 5300
QLD/NT
07 3442 6200
www.
acprod
.com.au
Product & Installation Manual: MAX-Tension
TM
TL-2
Notes
Long-Term Storage
Store materials under cover in dry, well-ventilated conditions, away from doorways open to the
environment.
Provide adequate ventilation between stacked pieces. Elevate and separate articles stacked
outdoors with spacers (poplar, ash, spruce).
Incline parts to allow for Maximum Drainage.
Avoid stacking material directly on soil or decaying vegetation.
For crated items, remove the lids to provide better ventilation and drying of the galvanized parts.
Customers will need to remove kits packed in cardboard boxes from the crates and store them
inside.
Summary of Contents for MAX-Tension TL-2
Page 32: ......
Page 33: ......
Page 34: ...GA TR09 AUSTRALIAN CONSTRUCTION PRODUCTS ACP ...
Page 35: ...GA TR12 AUSTRALIAN CONSTRUCTION PRODUCTS ACP ...