July 2020 |
Page
16
NSW/WA/SA/ACT
02 8708 4400
VIC/TAS
03 8773 5300
QLD/NT
07 3442 6200
www.
acprod
.com.au
Product & Installation Manual: MAX-Tension
TM
TL-2
Step 4 - Assemble Inner Side Slider (ISS) Panel on Rail 2
4.1 Prior to installing rail 2 (item 13), secure the inner side slider (ISS) panel (item 6) on upstream
end of rail 2 (item 13) using the supplied hardware (item 17).
NOTE:
Secure ISS on the non-traffic side of the rail.
DANGER
BOLTS SHALL BE INSTALLED WITH THE BOLT HEADS ON THE TRAFFIC SIDE AND
NUTS ON THE NON-TRAFFIC SIDE.
5.2 Tighten all hardware.
Item #
Part #
Description
Qty
6
MAXISSG
MAXTENSION INSIDE SLIDER GALV
1
13
W122G
3.81M MAXTENSION W-BEAM GALV
1
17
F1002
M16X32MM GALV SPLICE BOLT
8
8x
8x
8x
13
TRA
FFIC
FLO
W
17
17
6
17
RAI
L 2
NOTICE
NOTICE
Summary of Contents for MAX-Tension TL-2
Page 32: ......
Page 33: ......
Page 34: ...GA TR09 AUSTRALIAN CONSTRUCTION PRODUCTS ACP ...
Page 35: ...GA TR12 AUSTRALIAN CONSTRUCTION PRODUCTS ACP ...