Machine Maintenance
3-25
Replacing the LCD and Middle Frame Assembly
0
1. Prepare the LCD and middle frame assembly for mainboard installation.
2. Ensure that the LTE main and auxilliary rubber foams are attached to the middle frame.
Figure 3-38. LCD and Middle Frame Assembly
3. Ensure that the two washers are attached to the middle frame.
Figure 3-39. Washers
4. Install the mainboard. Perform the
procedure described on
page
3-26
.
LTE auxilliary
rubber foam
LTE main
rubber foam
Summary of Contents for Iconia A1-810
Page 1: ...Iconia A1 810 SERVICE GUIDE ...
Page 8: ...4 ...
Page 9: ...CHAPTER 1 Hardware Specifications ...
Page 11: ...1 3 AC Adapter 1 20 System Power Management 1 20 ...
Page 12: ...1 4 ...
Page 29: ...CHAPTER 2 Diagnostic Utilities ...
Page 30: ...2 2 PQAA Tool 2 3 Requirements 2 3 Installing the PQAA Tool 2 3 Running the PQAA Tool 2 9 ...
Page 38: ...2 10 Diagnostic Utilities ...
Page 39: ...CHAPTER 3 Machine Maintenance ...
Page 80: ...3 42 Machine Maintenance ...
Page 81: ...CHAPTER 4 Troubleshooting ...
Page 100: ...4 20 Troubleshooting ...
Page 101: ...CHAPTER 5 Jumper and Connector Locations ...
Page 102: ...5 2 Mainboard Layout 5 3 Top View 5 3 Bottom View 5 4 ...
Page 105: ...CHAPTER 6 FRU List ...
Page 106: ...6 2 Iconia A1 810 Exploded Diagrams 6 4 Main Assembly 6 4 FRU List 6 6 ...
Page 114: ...6 10 FRU Field Replaceable Unit List ...
Page 115: ...CHAPTER 7 Test Compatible Components ...
Page 116: ...7 2 Android OS Environment Test 7 4 ...
Page 121: ...CHAPTER 8 Online Support Information ...
Page 122: ...8 2 ...
Page 124: ...8 4 Online Support Information ...