17
Setting up the system
Pre-installation requirements
Selecting a site
Before unpacking and installing the system, select a suitable site for
the system for maximum efficiency. Consider the following factors
when choosing a site for the system:
•
Near a grounded power outlet
•
Clean and dust-free
•
Stable surface free from vibration
•
Well-ventilated and away from sources of heat
•
Secluded from electromagnetic fields produced by electrical
devices such as air conditioners, radio and TV transmitters, etc.
Checking the package contents
Check the following items from the package:
•
Acer Altos G330 system
•
Acer Altos G330 Resource CD
•
Acer Altos G330 accessory box
•
System keys (attached to the security keylock)
If any of the above items are damaged or missing, contact your dealer
immediately.
Save the boxes and packing materials for future use.
Summary of Contents for Altos G330 Series
Page 1: ...Acer Altos G330 Series User s Guide ...
Page 18: ......
Page 19: ...1 System tour ...
Page 33: ...2 System setup ...
Page 40: ...2 System setup 22 ...
Page 41: ...3 System upgrade ...
Page 68: ...3 System upgrade 50 ...
Page 69: ...4SystemBIOS ...
Page 101: ...5 System troubleshooting ...
Page 113: ...Appendix A Intel Active Management Technology ...
Page 121: ...Appendix B SATA RAID configuration ...
Page 127: ...Appendix C SAS RAID configuration ...