V2.4
13 |
P a g e
ACE RELIANCE SENSOR OPERATIONS MANUAL
4.7 Use the dual seal ¼” strip gauge to doublecheck the dimensions of the terminated end of the TEC cable
Figure 19. Dual Seal
¼”
strip gauge
5. 10 kPSI Sensor Model Installation
5.1 Unscrew the cover from the head of the sensor
Figure 20
Figure 21. The top cover is unscrewed
5.2 Remove the nuts from the cover and from the top of the sensors
Figure 22. The nuts are unscrewed
The top
cover
Summary of Contents for Reliance 1K
Page 1: ...V2 4 1 P a g e ACE RELIANCE SENSOR OPERATIONS MANUAL ACE Reliance Sensor Operations Manual...
Page 8: ...V2 4 8 P a g e ACE RELIANCE SENSOR OPERATIONS MANUAL Figure 9 Vise grips Figure 10 Tube cutter...
Page 26: ...V2 4 26 P a g e ACE RELIANCE SENSOR OPERATIONS MANUAL Figure 43 SRU Optix set up menu...