V2.4
33 |
P a g e
ACE RELIANCE SENSOR OPERATIONS MANUAL
Figure 52
TEC cable connection to Spooler
9.2 ACE Spooler set-up
The ACE Spooler set-up is identical to ACE Optix SRU set-up. Data viewing is also the same as for ACE Optix RTU.
(please refer to the SRU Optix instructions in this manual).
The bare end of TEC
cable is inserted into
a special grove
Tighten up the
bolt to secure
TEC cable in place
The TEC cable housing is
placed in the diamond
shaped groove on the
top of the vise
Tighten up the nut
with Allen Key to
secure the TEC cable
in the vise.
Summary of Contents for Reliance 1K
Page 1: ...V2 4 1 P a g e ACE RELIANCE SENSOR OPERATIONS MANUAL ACE Reliance Sensor Operations Manual...
Page 8: ...V2 4 8 P a g e ACE RELIANCE SENSOR OPERATIONS MANUAL Figure 9 Vise grips Figure 10 Tube cutter...
Page 26: ...V2 4 26 P a g e ACE RELIANCE SENSOR OPERATIONS MANUAL Figure 43 SRU Optix set up menu...