Installation & Operation Manual
- Model VTS
Contents of this Manual are Subject to Change Without Notification
Page 12
4.2
Rectangular Station Installation Diagrams
Station Sizes 18 and 24
Station Sizes 36 and 48
14" (356mm) Minimum Clearance
Mounting
Struts
Support Here
Flanged Station
“Option –F”
Locate duct supports within 12” of each end of the
station.
14” (356mm) Min.
Clearance for Access to this Side
INLET
DISCHARGE
Air Flow Direction
4. Slip the discharge end of the
station into the duct engaging station
into duct 1” at each end.
2. Lift station into position to provide
unobstructed access to the transmitter
and access panel.
3. Slip the inlet end of station into the
duct far enough to allow the station
to be lifted into the duct opening.
3. Install gaskets and/or duct
sealant between the station
flanges and companion flanges.
5. Secure both ends of station to
duct using tek screws and duct
sealant.
1. Verify the opening in the duct is properly sized for the station and installation method being used. Also verify
both ends of the duct where the station is to be attached are true and square before attempting to install station.
If the duct ends are not square and true, do not attempt to install station as it will not operate properly.
The 36” and 48” wide
stations are provided with integral mounting struts to help support the weight of the
stations. In addition to following the installation instructions above, each end of the strut shall be secured to
the building structure using properly rated hardware and methods in accordance with local building codes.
NOTE:
It’s acceptable to fabricate and install flanges onto the Accu
Station and ductwork on location. If
flanges are fabricated on site, it’s still important to verify both ends of duct are true and square prior to
and after installing flanges, otherwise the station will not operate properly.
1. Install companion flanges
(provided by others) over each
end of the duct.
Secure both ends using tek-screws
Apply Duct Sealant and/or Gasket, then
14” (356mm) Min. Clearance for Access to this Side
DISCHARGE
INLET
2. Lift the station into position
to provide unobstructed access
to the transmitter and access
panel.
4. Secure both ends using tek-screws.