10
AcuDC 210/220 Series
Installation Steps
AcuDC 210/220 Series meter is typically installed on the panel of switch gear.
1. Cut a rectangular hole on the panel of the switch gear.
The cutting size is as fig 2.3, Unit: mm (inch).
Fig 2.3 Panel Cutting
90±
0.5
0.5
0.0
cut
panel
90
+0.5
-0.0
0.5
44
+0.5 -0.0
0.5