— 25 —
4:
Uncoil pigtail and lay flat so it will feed into the packer without knotting or kinking.
5:
Loosen the clinch assembly, starting by loosening the set screw in the side of the
locking nut, then loosen the locking nut.
6:
Pull the UMP end until the distance between the bottom of the manifold and the
of the UMP is 5 inches (125 mm) (14 inches (356 mm) for floating suction) shorter
than the distance measured in step 2 (see figure 4.7)
If UMP is equipped with floating suction adapter, see
recommended floating suction installation in Chapter 1.
Take care not to damage the pigtail. If pump is to be adjusted
shorter, tension must be kept on pigtail to eliminate kinking.
7:
Tighten locking nut and torque to 150 ft-lb (200 N•m) minimum, then torque the set
screw to 30-35 in-lb (3.5 – 4 N•m).
Return line should be installed on every application to insure
against nuisance trips of electronic tank monitoring.
Figure 4.6 Loosen fittings
NOTICE
NOTICE
Figure 4.7 Adjust pump length
NOTICE