1. 

Attach end caps and join lengths 

of gutter 

TR22

, to match the length 

of the edge beam by notching the 
roller edge of one to allow the other 
to slide into it.
Put silicone in the joint and then 
use rivets, 

FAST009

, to fasten the 

sections together.

2. 

Repeat this for the other side.

3. 

Mark the rectangular cutout to suit 

the downpipe drop 

RWG18

 at the 

end you select.

4. 

Remove material and fix 

RWG18

 

with silicone and rivets.

5. 

Mark a line 110mm down from the 

top of the edge beam at both ends.

6. 

Run a string line between these 

marks. This is a reference to align 
the bottom position of the gutter 
brackets, 

RWG06

.

7. 

RWG06

 are to be fixed to the 

edge beam at either end and spaced 
equally along the length.
You may adjust bracket height to 
allow for a slight fall to the downpipe 
position.

8. 

Fit gutter onto all brackets at 

once. Push top of bracket into outer 
roll of gutter and bend small support 
arm down to hold the inner face.

9. 

Rivet the brackets to the gutter 

through the bottom hole of each 
bracket.

10. 

Fit downpipes to drops with 

silicone and rivets. Secure to posts 
with two downpipe straps bent to 
suit.

Bend down the two arms 

of the bracket over the 

back edge of the gutter.

TR22

RWG06

RWG18

TR22

TR25

Cutout for downpipe 
drop at back edge of 

gutter.

GUTTER AND DOWNPIPE

FLASHING & CAPPING

TR12

Fit barge capping 

TR12

 to the front and rear gables, fixing 

where there is a purlin beneath it using tek screws with neo 
washers.
Lay the ridge capping 

TR08 

centrally on the roof, overlapping 

the sections to make the same length as the roof sheeting. 
Safely fix the capping to every second rib with neo teks.

Summary of Contents for GCPSN2

Page 1: ...bscosheds com au DOWNLOAD OUR APP FOR ASSEMBLY VIDEOS PLEASE LEAVE A REVIEW Tell us about your experience Visit www abscosheds com au review 6445 mm 3425 mm Concrete slab footings detailed in engineer...

Page 2: ...mponents may be packed inside others almost hidden Carefully examine inside each component to ensure that you have located every item If a discrepancy is found contact Absco Industries immediately Don...

Page 3: ...IPTION PART CHK 6 TRUSS OUTER INFILL 450 mm C0450 6 TRUSS OUTER INFILL 600 mm C0600 8 ROOF PURLIN 2960 mm C2960 4 PURLIN JOINER 200 mm C0200 QTY DESCRIPTION PART CHK 4 OUTER EDGE BEAM 1585 mm ZACO 117...

Page 4: ...BRACKET RWG 06 4 GUTTER END STOP TR25 6 TRUSS SIDE JOINER PLATE 70 x 450 mm ZACO 181 14 MULTIPURPOSE BRACKET MPB BKT 17 16 COLUMN BASE BRACKET 12 mm HOLE BKT 03 3 FLY BRACE 40 x 40 x 450 mm ZACO 134...

Page 5: ...gs as noted in A Pour a perfectly level slab to the dimensions specified in the engineering drawings Alternatively you may prefer the slab to finish flush with the outside of the footings The slab wil...

Page 6: ...frame section to be spread over the sides of another frame section boxed frame section or H section Absco sheds frame sections are designed to nest into one another to create boxed frame sections Boxe...

Page 7: ...height at the centre and make sure it is perpendicular to the bottom chord 3 Fasten all frame pieces with two wafer head tek screws per tab Use six screws per side at the end where the top chord fits...

Page 8: ...and fix with 4 more screws Repeat these steps until you have three completed trusses 1 Layout the framing pieces as shown 2 Box the C0200 halfway into one end of a C2960 and fasten with 2 wafer head t...

Page 9: ...oceed to fastening Fasten all with tek screws at 300 centres TIP The top side of the beam needs wafer head teks The underside of the beam can be hex head tek screws 3 Remove all screws for the two out...

Page 10: ...our faces of the column 3 Place a BKT03 and fasten with a pair of M10 x 20mm bolts nuts and washers Poke the bolt through from the inside of the post and use a nut and washer on the outside Turn over...

Page 11: ...ting or collapse Assemblies are too heavy for 1 person to lift unaided Please refer to engineering drawings that specify concrete footings slab and post distances Safely lift a truss and place on top...

Page 12: ...where they interfere with the MPBs 2 Post Angle Braces Use two ZACO232 angle braces to sandwich post and truss Fasten with 6 tek screws per end Make sure to use wafer head tek screws to outside of tr...

Page 13: ...to be bent to suit and fit to the underside of truss with two hex head tek screws Fly brace Purlin Truss underside 40 45 degrees FRAME ASSEMBLY ZACO133 ZACO133 ZACO134 5 Roof strapping Lay roof strap...

Page 14: ...ill overhang the edge beam by min 30mm for the gutters 2 Use Hex head tek screw with neoprene washer FAST035 at every pan to top purlin and edge beam Use one Hex head tek screw with neoprene washer at...

Page 15: ...side of a gable end Repeat the last steps with the angle going the other way to make the two left sheets 3 Repeat steps until you have enough pieces to sheet the front and rear of the carport 8 sheets...

Page 16: ...he edge beam at either end and spaced equally along the length You may adjust bracket height to allow for a slight fall to the downpipe position 8 Fit gutter onto all brackets at once Push top of brac...

Page 17: ......

Page 18: ......

Page 19: ...ws garden tools etc Storage items that might be adversely affected by any of the above conditions may require additional protection such as being sealed or covered by plastic sheets and or stacked abo...

Page 20: ...s of claiming warranty To make a claim under the warranty within the warranty period you will need to contact the manufacturer directly by phone or email Contact Number 1800 029 701 Contact Email admi...

Page 21: ...itions such as extreme heat or cold The product should only be used for storing items such as gardening equipment and should not be used for articles that may be prone to damage if they come into cont...

Reviews: