Absco Industries
Assembly Instruction Manual
ABSCO GABLE CARPORT
MODEL: GCPDN2
6.0mW x 6.0mD x 2.98mH
Model: GCPDN2
8/06/23
16
1.
Attach end caps and join lengths
of gutter
TR22
, to match the length
of the edge beam by notching the
roller edge of one to allow the other
to slide into it.
Put silicone in the joint and then
use rivets,
FAST009
, to fasten the
sections together.
2.
Repeat this for the other side.
3.
Mark the rectangular cutout to suit
the downpipe drop
RWG18
at the
end you select.
4.
Remove material and fix
RWG18
with silicone and rivets.
5.
Mark a line 110mm down from the
top of the edge beam at both ends.
6.
Run a string line between these
marks. This is a reference to align
the bottom position of the gutter
brackets,
RWG06
.
7.
RWG06
are to be fixed to the
edge beam at either end and spaced
equally along the length.
You may adjust bracket height to
allow for a slight fall to the downpipe
position.
8.
Fit gutter onto all brackets at
once. Push top of bracket into outer
roll of gutter and bend small support
arm down to hold the inner face.
9.
Rivet the brackets to the gutter
through the bottom hole of each
bracket.
10.
Fit downpipes to drops with
silicone and rivets. Secure to posts
with two downpipe straps bent to
suit.
Bend down the two arms
of the bracket over the
back edge of the gutter.
TR22
RWG06
RWG18
TR22
TR25
Cutout for downpipe
drop at back edge of
gutter.
GUTTER AND DOWNPIPE
FLASHING & CAPPING
TR06
Fit barge capping
TR06
to the front and rear gables, fixing
where there is a purlin beneath it using tek screws with neo
washers.
Lay the ridge capping
TR30
centrally on the roof, overlapping
the sections to make the same length as the roof sheeting.
Safely fix the capping to every second rib with neo teks.