NOTE: 

Throughout frame construction the structure will be unstable until construction is fully 

completed. Make sure during construction framework is braced using rope or timber props to 

stabilise and prevent twisting or collapse. Assemblies are too heavy for 1 person to lift unaided.

Safely lift a truss and place on 
top of a pair of posts.
Make sure the outside of post 
and end of truss are flush.
Fasten with 6 hex head tek 
screws in the MPB and into the 
truss.
Do this for both end trusses.

POSTS

FITTING END TRUSS TO POSTS

FITTING EDGE BEAM

Truss

Flush

Post

1. 

Safely lift and align the edge 

beam as shown. It has to sit 80 
mm below the post as shown.
Fasten to the column with 10 hex 
head tek screws.

2. 

After both ends of the beam 

are secured, refit the outer 
pieces of edge beam 

ZACO117

Remember wafer head teks for 
the top side.

3. 

Close both ends of the edge 

beam with an end cap 

ZACO155 

and two tek screws.

1

1. 

Place the posts on the 

foundation, use the dimensions 
shown to confirm correct 
placement.
Position each column with the 
top bracket to the centre.
Mark out the base bracket hole 
positions on the concrete.
Using a 12mm masonry drill bit, 
drill the anchor holes and secure.

Please refer to 

engineering drawings 

that specify concrete 

footings / slab and post 

distances.

5670

5770

5920

FRONT

5820

Summary of Contents for GCPDN2

Page 1: ...eds com au DOWNLOAD OUR APP FOR ASSEMBLY VIDEOS PLEASE LEAVE A REVIEW Tell us about your experience Visit www abscosheds com au review 6445 mm 6345 mm For construction in non cyclonic areas Wind ratin...

Page 2: ...omponents may be packed inside others almost hidden Carefully examine inside each component to ensure that you have located every item If a discrepancy is found contact Absco Industries immediately Do...

Page 3: ...IPTION PART CHK 6 TRUSS OUTER DIAGONAL 958 mm S0958 6 TRUSS OUTER INFILL 650 mm C0650 12 TRUSS INNER INFILL 850 mm C0850 12 PURLIN 2960 mm C2960 6 PURLIN JOINER 200 mm C0200 QTY DESCRIPTION PART CHK 4...

Page 4: ...UTTER END STOP TR25 6 TRUSS SIDE JOINER PLATE 70 x 450 mm ZACO 181 10 MULTIPURPOSE BRACKET MPB BKT 17 16 COLUMN BASE BRACKET 12 mm HOLE BKT 03 3 FLY BRACE 40 x 40 x 850 mm ZACO 125 6 FLY BRACE 40 x 40...

Page 5: ...gs as noted in A Pour a perfectly level slab to the dimensions specified in the engineering drawings Alternatively you may prefer the slab to finish flush with the outside of the footings The slab wil...

Page 6: ...frame section to be spread over the sides of another frame section boxed frame section or H section Absco sheds frame sections are designed to nest into one another to create boxed frame sections Boxe...

Page 7: ...vertical M0525 and make sure it is perpendicular to the bottom chord 3 Fasten all frame pieces with two wafer head tek screws per tab Use six screws per side at the end where the top chord fits insid...

Page 8: ...d down the other and fix with 4 more screws 7 Next each side will need a larger joining plate ZACO181 and 20 screws per side Repeat these steps until you have three completed 5 8m trusses 1 Layout the...

Page 9: ...roceed to fastening Fasten all with tek screws at 300 centres TIP The top side of the beam needs wafer head teks The underside of the beam can be hex head tek screws 3 Remove all screws for the two ou...

Page 10: ...our faces of the column 3 Place a BKT03 and fasten with a pair of M10 x 20mm bolts nuts and washers Poke the bolt through from the inside of the post and use a nut and washer on the outside Turn over...

Page 11: ...trusses POSTS FITTING END TRUSS TO POSTS FITTING EDGE BEAM Truss Flush Post 1 Safely lift and align the edge beam as shown It has to sit 80 mm below the post as shown Fasten to the column with 10 hex...

Page 12: ...re they interfere with the MPBs 2 Post Angle Braces Use two ZACO232 angle braces to sandwich post and truss Fasten with 6 tek screws per end Make sure to use wafer head tek screws to outside of truss...

Page 13: ...own This is to be bent to suit and fit to the underside of truss with two hex head tek screws Fly brace Purlin Truss underside 40 45 degrees FRAME ASSEMBLY ZACO123 ZACO124 ZACO124 ZACO125 ZACO123 5 Ro...

Page 14: ...s Give first sheet a 20mm overhang of the end truss All sheets will overhang the edge beam by min 30mm for the gutters 2 Use Hex head tek screw with neoprene washer FAST035 at every pan to top purlin...

Page 15: ...shing 4 You ll have four pieces That s the sheets done for the right side of a gable end Repeat the last steps with the angle going the other way to make the four left sheets 5 Repeat steps until you...

Page 16: ...he edge beam at either end and spaced equally along the length You may adjust bracket height to allow for a slight fall to the downpipe position 8 Fit gutter onto all brackets at once Push top of brac...

Page 17: ......

Page 18: ......

Page 19: ...ows garden tools etc Storage items that might be adversely affected by any of the above conditions may require additional protection such as being sealed or covered by plastic sheets and or stacked ab...

Page 20: ...s of claiming warranty To make a claim under the warranty within the warranty period you will need to contact the manufacturer directly by phone or email Contact Number 1800 029 701 Contact Email admi...

Page 21: ...itions such as extreme heat or cold The product should only be used for storing items such as gardening equipment and should not be used for articles that may be prone to damage if they come into cont...

Reviews: