STEP 3.
REAR
SIDE
FRONT
FRONT
REAR
1355
2790
1355
6mm
6mm
MARK A LINE 1355 IN FROM EACH END OF BOTH EDGE (SIDE) BEAMS. THESE ARE THE
POSITIONS FOR LOCATING THE COLUMN TOP BRACKETS, TO WHICH THE COLUMNS AND
CROSS BEAMS WILL BE LATER CONNECTED.
THIS SET OF FOUR
HOLES MUST MATCH
THE FOUR HOLES IN THE
CROSS BEAM.
THE REAR RHS COLUMNS ARE 50mm SHORTER THAN THE FRONT RHS COLUMNS. THIS
PRODUCES ABOUT A ONE DEGREE FALL IN THE ROOF, TO ALLOW RAINWATER TO FLOW TO
THE REAR DOWNPIPE.
THEREFORE, TO ENSURE THAT THE COLUMNS WILL REMAIN VERTICAL WHEN THE
STRUCTURE IS RAISED, EACH COLUMN TOP BRACKET MUST BE OFFSET BY 6mm AS
SHOWN BELOW. YOU CAN SEE BELOW HOW THE END RESULT WILL KEEP THE COLUMNS
VERTICAL BUT TILT THE ROOF.
FLUSH WITH INSIDE
FLANGE AT THIS POINT
FLUSH WITH INSIDE
FLANGE AT THIS POINT
MARK THE HOLE POSITIONS FOR THE FOUR HOLES TO BE DRILLED IN THE BEAMS AT EACH
LOCATION, AND DRILL 10mm HOLES. DO NOT FASTEN THE COLUMN TOP BRACKETS TO THE
EDGE BEAMS AT THIS STAGE.