Absco Industries
Assembly Instruction Manual
ABSCO BIN COVER
MODEL: 2308WBCK
2.27m W x 0.85m D x 1.15m H
Model: 2308WBCK
1.1
2
21/09/2022
GENERAL INSTRUCTIONS
• Before commencing any assembly, read through these instructions in detail to gain a thorough
understanding of assembly methods and associated details.
• Unpack the carton and carefully identify and check off all the parts against the parts described
and illustrated on "COMPONENTS PACKING LIST" pages.
SITE PREPARATION
• The site for the shed must be level. An uneven surface may result in misalignment of parts.
• The shed shall be erected on top of a reinforced concrete slab and anchored down appropriately
illustrated on “FINAL CONSTRUCTION” page.
TOOLS REQUIRED
SAFETY NOTES
• Some parts may have sharp edges. It is advisable to wear gloves when handling these items and
safety glasses if drilling holes. Sensible shoes are highly recommended.
• Do not erect your shed in windy conditions.
• Ensure that the shed is securely anchored to a solid foundation immediately after construction is
completed.
• It is highly recommended to erect the shed with two or more people.
• Do not sit, stand or walk on the roof of your shed.
RECOMMENDED
5/16” Hex driver bit
Hammer drill
Shifter
10mm metal drill bit
10mm masonry drill bit
Pop riveter
Tinsnips
Cordless drill
4mm drill bit