8
INSTALLATION
Steps of installation
- Preparing installation
- Installing the mounting plate
- Mounting the operator and the arm
- Connecting the operator to mains
- Commissioning
- Testing
- Connecting impulse devices
Preparing installation
- Check the proper function of the door
- hinges
- door clearance
- Check the proper function of the lock
- lock case
- striker plate
Tools required
- Torx T8, T10, T20 and T25
- Metric hexagonal key 3, 4 and 6 mm
- Flatblade screwdriver, small
- Torque wrench with metric Allen socket 6 mm
Base material
Minimum requirements of wall profile
Steel
5 mm
Aluminium
6 mm
Wood
50 mm
Mount a door stop to the door open position so that wind will not drive
the door against the wall, resulting in damage