Taking the product out of and back into operation
If required, you can take your ABL Wallbox out of operation. To take the wallbox out of
operation, please proceed as follows:
1. Switch off the internal RCCB(s) (connection to the electricity grid is interrupted).
2. In addition, switch off the upstream MCB.
3. Always observe the five golden rules of electrical installation!
Now, no charging procedure can be carried out with the ABL Wallbox and it can be
uninstalled if required.
WARNING!
The electrical de-installation of the
eMH3
must always be carried out by
a qualified electrical contractor.
To take the wallbox into operation again at a later time, please proceed as follows:
1. Switch on the upstream MCB.
2. Switch on the internal RCCB(s) (connection to the electricity grid is established).
When the ABL Wallbox is reconnected to the electricity grid, it will reinitiate the start-
up procedure: The vehicle can now be connected for charging.
PLEASE NOTE:
The charging function of the ABL Wallbox can also be deactivated and re-
activated at a later time via the integrated RFID module: This is described
in detail in section “Deactivating and reactivating of the charging function
via RFID” on page 14 of the user manual for the ABL Wallbox.