
EN - 14
BAL.0675.0 • 2019-09-16
6 Putting into operation
FEC W3
6.2 Connecting and switching on
1
Connect the torch system
, hose, and rubber connector to the fume extraction system
2
Plug in the mains plug.
3
Switch on the extraction system
by pressing the I/Power on the control panel.
5.2 Control elements on page EN-12
1
Fume extraction system
FEC W3
2
Integrated start and stop system
3
Suction connector
4
Torch system
Fig. 5
Putting into operation
NOTICE
• An external current clamp can be added on and is available as an accessory.
6.3 Current clamp (optional) on page EN-16
2
3
4
1
Summary of Contents for FEC W3
Page 31: ...FEC W3 13 Anhang BAL 0675 0 2019 09 16 DE 31 Abb 18 Elektroschaltplan 230 V 50 Hz...
Page 32: ...DE 32 BAL 0675 0 2019 09 16 13 Anhang FEC W3 Abb 19 Elektroschaltplan 120 V 50 60 Hz...
Page 33: ...FEC W3 13 Anhang BAL 0675 0 2019 09 16 DE 33 Abb 20 Elektroschaltplan 120 V 50 60 Hz...
Page 63: ...FEC W3 13 Appendix BAL 0675 0 2019 09 16 EN 31 Fig 18 Circuit diagram 230 V 50 Hz...
Page 64: ...EN 32 BAL 0675 0 2019 09 16 13 Appendix FEC W3 Fig 19 Circuit diagram 120 V 50 60 Hz...
Page 65: ...FEC W3 13 Appendix BAL 0675 0 2019 09 16 EN 33 Fig 20 Circuit diagram 120 V 50 60 Hz...
Page 95: ...FEC W3 13 Annexe BAL 0675 0 2019 09 16 FR 31 Fig 18 Sch ma de connexion lectrique 230 V 50 Hz...