ABB-Welcome M
Mounting / Installation
|
— 58 —
Pos: 84 /B usch-J aeg er (Neus truk tur )/M odul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n ( --> Fü r alle Doku men te < -- )/2. E bene /M - O/ Mont age @ 1 8\m od_1 302 615 960 458 _15. docx @ 10 342 4 @ 2 @ 1
6.3
Mounting
Pos: 85. 1 /DinA4 - Anleit ung en O nline/I nhal t/KNX/DoorE ntry/ 832 20-AP-xxx /Mo nta ge - Mo dule/ Mon tag e - Mon tage dos e -- 83 220 -AP-xxx @ 19\ mod _132 325 040 684 8_1 5.doc x @ 1 110 98 @ @ 1
Dismantling
Open the housing of the panel by pulling the clamp at the bottom of the device.
Mounted on the wall or flush-mounted box
Fix the bottom of the device directly on a level wall surf ace or on an flush-mounted
socket according to DIN 49073-1.
Wiring