Assembly Instructions / TPX44-H
4 Installing the turbocharger / 4.3 Attaching the turbocharger to the
bracket
© Copyright 2019 ABB. All rights reserved.
HZTL455311P0037_EN
Rev.A
November 2019
4.3
Attaching the turbocharger to the bracket
Fig. 8: Placing the turbocharger on the bracket
Product
Through hole in
bearing casing [mm]
Fixing screws [mm]
Tightening torque [Nm]
(assumed friction coeffi-
cient
µ
= 0.12)
TPX44-H
Ø 14
M12
100
Table 7: Tightening torque for turbocharger fixing screws
1. Make sure that the covers of the oil and water connections are removed.
2. Make sure that the gaskets are not damaged and are positioned correctly in the slots.
3. Install the swivel lifting eye (S) and attach the lifting gear to it.
4. Align the turbocharger over the threaded rods of the bracket.
5. Place the turbocharger on the bracket.
6. Lightly oil the hexagon nuts.
7. Fit the hexagon nuts. Observe the tightening torque.
8. Connect cable to speed sensor (86505).
u
Remove the lifting gear.
u
Connect all gas and air lines, as well as the oil supply line, according to the instructions of
the enginebuilder.
u
Fit the water pipes according to the instructions of the enginebuilder.
Page
12
/
17
Summary of Contents for TPX Series
Page 2: ......