Parameter
Specification
Eye bolts to hoist the charge post
M10, 45 mm (1 3/8 in)
Caps to replace the eye bolts after trans-
port of the charge post
To fit in the holes for the eye bolts
Note: It is possible that more parts are required in the delivery. Refer to
the order.
12.3
Required tools for installation
Parameter
Specification
Hoisting equipment or forklift truck
Capable to lift the EVSE safely. Take into
account the dimensions, the mass, and
the center of gravity.
Swivel eye bolts or bolts with lifting
loops (to use with hoisting equipment)
As a standard, eye bolts are installed on
the cabinets. Refer to section
.
Thread M10 for the charge post
Thread M16 for the power cabinet
Bolts
Size M16
Hex keys
Standard set of hex keys
Open spanners
Standard set of open spanners
Torque socket wrench
For the torque specifications, refer to
section
.
Screwdriver, cross
Size M5 (8 mm (0.3 in))
Wire cutter
-
Wire stripper pliers
-
Crimp pliers
-
12.4
Required parts for installation
Part
Specification
Fasteners and washers, to connect the
charge post to the foundation
M12, class A2, length 70 mm (2.75 in)
Fasteners and washers, to connect the
power cabinet to the foundation
M16, class A2, length 70 mm (2.75 in)
Fasteners and washers, for the earthing
connections
M11, class A2, length 70 mm (2.75 in)
Table 1: Cable lugs
Location Wire
Size
Maximum width
Maximum length
[mm]
[in]
[mm]
[in]
Power
cabinet
PE
M12
35
1.4
70
2.7
M10
25
70
50
70
Technical data
9AKK107992A6488-EN | 004
73
Summary of Contents for Terra HP Generation 3
Page 103: ...Technical data 9AKK107992A6488 EN 004 103 ...
Page 104: ......