6.2.4
Guide the cables to the cabinet
Preliminary requirements
1.
The cable inlets are open.
Procedure
1. Guide the AC input cable, the AC
auxiliary power cable, the interlock
and DC guard and the CAN cables (A)
through the opening (B).
2. Guide the DC output cables (C)
through the opening (D).
6.2.5
Close the cable inlets
1. Move the sliding plates (B) on the
guidance plate to close the cable
inlets and hold the cables (C) in place.
2. Tighten the fasteners (A).
6.2.6
Install the front cover plate (concrete foundation)
Preliminary requirements
1.
The cabinet is installed on
the foundation.
•
Four fasteners M10
•
Torque wrench
C D
A
B
A
C
B
Installation
9AKK107992A6488-EN | 004
39