
6. Connect the new EV charge cable:
a. Connect the wires.
b. Tighten the screws (B) to the correct torque. For the specification, refer to section
.
c. Connect the EV charger 2-pin connector that is receptable to the CP/PP
connector.
7. Prepare for operation:
a. Install the plastic cover.
b. Install the maintenance cover. Refer to section
.
c. Install the cabinet cover. Refer to section
Electrical installation
BCM.V3Y01.0-EN | 001
37