![ABB Terra AC Series Installation Manual Download Page 14](http://html.mh-extra.comterra-ac-series_installation-manual_1107014.png)
5. The electrical interfaces of the EVSE communicate with the on-board computer (blue
lines).
(*): Connections between parts of the EVSE and the CPU system. The arrow shows the
direction of the input and output signals.
2.5
Overview
2.5.1
Overview of the system
E
A
B
C
D
G
F
A
EVSE
B
AC grid input
C
EV
D
Parking space
E
RFID card or smartphone
F
Structure to install the EVSE on
G
EV charge cable
Part
Function
EVSE
Refer to section
Structure
To install the EVSE on and to keep the
EVSE in position.
AC grid input
To supply the electricity to the EVSE
EV charge cable
To conduct the charge from the EVSE to
the EV
EV
The EV of which the batteries need to be
charged
Parking space
Location for the EV during the charge ses-
sion
RFID card or smartphone
To authorize the user to use the EVSE
Description
14
BCM.V3Y01.0-EN | 001