7.3.3
Connect the AC input cable (3 phase)
Preliminary requirements
•
Torque screw driver
•
AC input cable (3 phase, TN-
TT networks)
Procedure
1. Loosen the screws (A).
2. Insert the cable connector into the
terminal block (B).
3. Connect these wires:
1. Earthing wire (C)
2. Neutral wire (D)
3. L1 (E)
4. L2 (F)
5. L3 (G)
Refer to section
4. Tighten the screws (A) to the correct
torque. For the specification, refer to
section
.
7.3.4
Secure the cables
Preliminary requirements
•
Torque screw driver
•
Strain relief for the cable
Procedure
1. Secure the cables (A) with the strain
relief (B).
2. Install the two screws (C) of the strain
relief.
B
E
D
F
G
C
A
A
B
C
Electrical installation
BCM.V3Y01.0-EN | 001
33