3.7.6
Integrated payment terminal - Nayax
3.7.7
Integrated payment terminal - CCV
3.7.8
Fiscal metering system
The EVSE can optionally be equipped with an MID compliant DC energy meter. This
upgrade can be installed in the factory or in the field.
A
B
C
A
Time (hh:mm:ss)
B
Date (YY-MM-DD)
C
Delivered DC power (kWh)
Description
44
9AKK108467A6398-EN | 002