3.4
Overview
3.4.1
Overview of the system
B
E
F
D
C
G
A
A
EV
B
Parking space
C
Front of the EVSE
D
EVSE
E
AC input cable
F
Power distribution board
G
EV charge cable
Part
Function
EV
The EV of which the batteries need to be charged
EVSE
Refer to section
.
Parking space
Location for the EV during the charge session
AC input cable
To supply the electrical energy to the EVSE
Power distribution board
To connect the EVSE to the AC grid input
EV charge cable
To conduct the charge from the EVSE to the EV
Description
30
9AKK108467A6398-EN | 002