PR8 - 2
WBPEEUI210509A1
Procedure
□
7. Install the right DIN mounting bracket and use the Phillips
screwdriver to install the two screws that secure the right DIN
rail mounting bracket to the DC bus monitoring assembly.
□
8. Attach the DC bus monitoring assembly to the DIN rail on
the rear of the power chassis and press the locking devices
into place as shown in Figure
PR8-3
.
□
9. Refer to Figure
PR8-3
and connect the wires to the DC bus
bar and the cable connector to J1.
NOTE:
Do not disconnect or connect the cable from the DC bus monitoring
assembly to the DC bus bar while the system is operating. Doing so could
cause a PFI to occur.
□
10. If this procedure is part of DC bus monitoring replacement
rather than an initial installation, duplicate the wiring and
cabling from the replaced bus monitoring assembly to the new
DC bus monitoring assembly. If this procedure is part of initial
DC bus monitoring assembly installation, continue with the
next procedure in the installation sequence.
Figure PR8-1. DC Bus Monitoring Assembly Jumper Access
T 04497 A
J1
J2
D C B U S M O N ITO R IN G A S S E M B LY
P ROTE C TIV E
C OVE R
R IG H T D IN R AIL
M O U N TIN G B R AC K E T
S C R E W S
(2)
Summary of Contents for Symphony Harmony Series
Page 1: ...Instruction Harmony Series Modular Power System III...
Page 9: ...WBPEEUI210509A1...
Page 17: ...WBPEEUI210509A1...
Page 25: ...WBPEEUI210509A1...
Page 33: ...WBPEEUI210509A1...
Page 43: ...WBPEEUI210509A0...
Page 57: ...WBPEEUI210509A0...
Page 59: ...WBPEEUI210509A0...
Page 65: ...WBPEEUI210509A0...
Page 69: ...WBPEEUI210509A0...
Page 79: ...WBPEEUI210509A0...
Page 101: ...WBPEEUI210509A1...