L2275
Emax UL
7/132
Doc. N°
Mod.
RH0109002
Apparatus
Scale
Page N°
Fig. 10
Fig. 11
5
1
4
2
E1 - E2 - E3
E4 - E6
3
Fig. 12a
Example for E1B 08 according to the plate diagram
4.3.2
Installation of the cradle (Fig. 12b)
Fix the cradle by means of the screws (1), washers (2) and nuts (3) (M8 x 16), supplied by ABB SACE. If other screws are used, check that the
head of the screws does not extend more than 5.5 mm (0.22 inches) from the base of the cradle.
4.3.3
Installation of the cradle on board a ship (Fig. 12a)
Regarding the fixing points of the SACE Emax draw out version air power circuit breakers, for the applications on board a ship, additional fixing
on the sides of the cradle itself is recommended (the M12 screws and the spacers are not provided in the supply).
Spacers
Spacers