*HQHUDO,QIRUPDWLRQDQG,QVWDOODWLRQ8VHU¶V*XLGH
6HFWLRQ )LQDO&KHFN
3BSE 020 923R101
69
Proceed as follows to check analog channels:
–
Set the output value, and check that the corresponding output shows this
value on the display. Then measure the value on the screw terminal block
of the corresponding MTU, and if practical, at the process.
–
When checking analog output signals use a multimeter to test that an
output signal is obtained over the complete signal range.
)LQDO&KHFN
When the test of the control system is complete, and the plant functions
satisfactorily, the following actions should be taken:
•
Check that all S800 I/O modules are properly inserted in the MTUs.
•
Check that all terminal screws on MTUs are properly tightened and that all
grounds are good.
•
Check that all cable connectors are properly mated.
•
Check that all cable coverings or tie wraps are installed properly to avoid cable
wear.
•
Check that no tools or debris from installation remain in the cubicle. Clean the
cabinet.
Summary of Contents for S800 I/O
Page 1: ...S800 I O HQHUDO QIRUPDWLRQ DQG QVWDOODWLRQ User s Guide 3BSE 020 923R101...
Page 10: ...HQHUDO QIRUPDWLRQ DQG QVWDOODWLRQ 8VHU V XLGH 7DEOH RI RQWHQWV viii 3BSE 020 923R101...
Page 80: ...HQHUDO QIRUPDWLRQ DQG QVWDOODWLRQ 8VHU V XLGH KDSWHU QVWDOODWLRQ 70 3BSE 020 923R101...
Page 102: ...HQHUDO QIRUPDWLRQ DQG QVWDOODWLRQ 8VHU V XLGH KDSWHU RQILJXUDWLRQ 92 3BSE 020 923R101...
Page 104: ...HQHUDO QIRUPDWLRQ DQG QVWDOODWLRQ 8VHU V XLGH KDSWHU 2SHUDWLRQ 94 3BSE 020 923R101...
Page 114: ...HQHUDO QIRUPDWLRQ DQG QVWDOODWLRQ 8VHU V XLGH KDSWHU 0DLQWHQDQFH 104 3BSE 020 923R101...
Page 146: ...HQHUDO QIRUPDWLRQ DQG QVWDOODWLRQ 8VHU V XLGH SSHQGL 5HIHUHQFHV 136 3BSE 020 923R101...
Page 150: ...HQHUDO QIRUPDWLRQ DQG QVWDOODWLRQ 8VHU V XLGH QGH 140 3BSE 020 923R101...