phase, and during normal service. For more details on tool usage, see the PCM600
documentation.
The engineering manual contains instructions on how to engineer the IEDs using the
different tools in PCM600. The manual provides instructions on how to set up a
PCM600 project and insert IEDs to the project structure. The manual also recommends
a sequence for engineering of protection and control functions, LHMI functions as well
as communication engineering for IEC 61850 and other supported protocols.
The installation manual contains instructions on how to install the IED. The manual
provides procedures for mechanical and electrical installation. The chapters are
organized in chronological order in which the IED should be installed.
The operation manual contains instructions on how to operate the IED once it has been
commissioned. The manual provides instructions for monitoring, controlling and
setting the IED. The manual also describes how to identify disturbances and how to
view calculated and measured power grid data to determine the cause of a fault.
The point list manual describes the outlook and properties of the data points specific to
the IED. The manual should be used in conjunction with the corresponding
communication protocol manual.
The technical manual contains application and functionality descriptions and lists
function blocks, logic diagrams, input and output signals, setting parameters and
technical data sorted per function. The manual can be used as a technical reference
during the engineering phase, installation and commissioning phase, and during normal
service.
1.3.2
Document revision history
Document revision/date
Product version
History
A/2013-11-22
4.0
First release
Download the latest documents from the ABB Website
http://www.abb.com/substationautomation
.
1.3.3
Related documentation
Product series- and product-specific manuals can be downloaded from the ABB
Website
http://www.abb.com/substationautomation
.
Section 1
1MRS240044-IB A
Introduction
6
REF615R
Engineering Manual