![ABB REL 505-C1 2.3 Series Installation And Commissioning Manual Download Page 59](http://html1.mh-extra.com/html/abb/rel-505-c1-2-3-series/rel-505-c1-2-3-series_installation-and-commissioning-manual_3045595059.webp)
53
Overview
Chapter 10
Verifying settings by secondary
injection
All used setting groups should be tested.
Note!
This terminal is designed for a maximum continuous current of four times the nominal
current.
Note!
Please observe the measuring accuracy of the terminal, the test equipment and the an-
gular accuracy for both of them.
Note!
Please consider the configured logic from the function block to the output contacts
when measuring the operate time.